Are Construction Cranes Disassembled for Transportation?

Tower crane at a construction site, showcasing residential building projects

Construction cranes play a vital role in lifting and moving heavy materials on building sites. Once construction is completed, however, cranes need to be disassembled and transported away from the site. But how exactly are construction cranes taken down and transported? Do they fold up for easier movement? Let’s explore the process of disassembling cranes, their transportation methods, and how long the process takes.

Construction cranes are often disassembled for transportation, especially larger ones. This process involves careful planning to ensure safe and efficient relocation.

After a construction project is finished, cranes are taken down and transported to other locations or storage. Depending on the size and type of crane, this process can involve disassembly, moving individual components, and then reassembly. In the following sections, we will explore the logistics of crane transportation, the assembly and disassembly process, and the typical timeline involved in this operation.

How Do Construction Cranes Get Transported?

Tower crane assembly process at a large construction site

Transporting a construction crane involves breaking down the crane into manageable components and moving them to the next project site or storage. But how exactly are these massive machines transported?

Large construction cranes are transported by dismantling them into smaller parts that can be moved via trucks, trailers, or other heavy machinery.

The transportation of construction cranes depends on the type and size of the crane. For large tower cranes1, disassembly is required before transportation. After the crane is disassembled into smaller components—such as the jib2, counterweights3, tower sections, and cab—these parts are loaded onto flatbed trucks or specialized trailers.

Smaller mobile cranes, on the other hand, can often travel to the next site without the need for disassembly, as they are designed to be driven from one location to another. In some cases, specialized transporters, such as cranes mounted on large flatbed trucks, are used to move large crane components.

Transportation Components:

Component Description
Jib The horizontal arm of the crane, often broken into sections.
Counterweights Weights added to balance the crane, loaded separately.
Tower Sections Sections of the crane's tower, disassembled for transport.
Cab The operator's cabin, often removed and transported separately.

How Are Construction Cranes Taken Down?

Construction site with multiple tower cranes, modern buildings in the background, and ongoing urban development.

The process of taking down a construction crane can be complex, especially for large tower cranes. But how are they actually taken down?

Cranes are taken down in a carefully planned sequence, starting with disassembling smaller components and using another crane for larger parts.

Taking down a construction crane begins with removing the smaller, more easily accessible parts. For tower cranes, this involves detaching the counterweights, lowering the jib, and dismantling the tower sections.

In most cases, a smaller crane is used to assist in the disassembly. This smaller crane is often placed on the ground or atop a building and helps lower parts of the crane safely. For very tall cranes, the disassembly can take place in stages, with parts being removed one at a time as the crane is gradually lowered.

Typical Disassembly Sequence:

Step Description
Step 1: Jib Removal The jib (horizontal arm) is removed first.
Step 2: Counterweights Counterweights are taken off to reduce the crane's load.
Step 3: Tower Section Sections of the tower are taken down, starting from the top.
Step 4: Crane Base The crane base or cab is disassembled and lowered.

Do Construction Cranes Fold?

Tower cranes at a construction site under a clear blue sky

The term "folding" may suggest that cranes have a mechanism to collapse into a compact form. But do construction cranes fold for easier transport?

Most construction cranes do not fold; instead, they are disassembled into parts for transport.

Generally, construction cranes do not fold in the way you might expect a compact machine to collapse. While smaller mobile cranes and truck-mounted cranes4 may have telescoping arms that retract, larger cranes, like tower cranes, need to be disassembled. Their large components are too heavy and bulky to fold, so they must be taken apart and moved in separate sections.

Some smaller cranes, however, do feature a foldable boom or arm that can be collapsed to reduce the size of the crane during transportation. These cranes are designed to be more compact and mobile, allowing them to travel on public roads.

Differences Between Folding and Disassembly:

Crane Type Can It Fold?
Tower Cranes No, they must be disassembled.
Mobile Cranes Yes, some models have telescoping or folding booms.
Truck-Mounted Cranes Yes, many can fold for easy transportation.

Are Cranes Assembled?

VEGA tower crane overlooking a construction site by the seaside

Once the crane parts have been transported to the new location, they must be reassembled before they can be put to work again. But how are cranes assembled?

Cranes are reassembled by carefully fitting their components back together, with the help of a smaller crane or lifting equipment.

Reassembling a crane involves putting the major components back together in the reverse order of the disassembly. For tower cranes, this means assembling the tower sections, attaching the jib, and reinstalling the counterweights. A smaller crane or another lifting device is often used to lift and position the larger sections as they are put together.

The assembly process may also involve ensuring that all mechanical, electrical, and safety systems are in place and functioning properly before the crane is used for its intended tasks.

Typical Reassembly Steps:

Step Description
Step 1: Base Assembly The base of the crane is installed and secured.
Step 2: Tower Sections The tower sections are stacked and bolted together.
Step 3: Jib Installation The horizontal arm (jib) is added to the crane.
Step 4: Counterweights Counterweights are attached for balance.

What Happens to Cranes After Construction?

Multiple tower cranes operating under overcast skies at a construction site

Once construction is complete, cranes don’t just vanish. They are typically moved to other construction sites or stored for future use. But what exactly happens to cranes after construction?

After construction, cranes are disassembled, transported to other sites, or stored for future use.

After a building project finishes, cranes are usually disassembled and transported to other job sites. In some cases, cranes may remain in place for additional construction phases, especially for large projects. Once the crane is no longer needed, it is dismantled, and the components are either moved to a new location or stored until needed for future projects.

Cranes that have reached the end of their service life may be sold, recycled, or dismantled permanently.

Post-Construction Crane Lifecycle:

Option Description
Relocation Cranes are moved to another job site.
Storage Some cranes are stored for future use.
Disposal/Recycle Old or decommissioned cranes may be sold or recycled.

How Long Does It Take to Disassemble a Crane?

Tower crane lifting construction materials at an industrial site

The disassembly of a crane is a time-consuming process that requires careful planning and the right equipment. But how long does it actually take?

Disassembling a crane can take anywhere from a few days to a week, depending on the size and complexity of the crane.

The time it takes to disassemble a crane varies depending on the size and type of crane, as well as the complexity of the disassembly process. Smaller cranes can be taken down in a few days, while larger cranes, like tower cranes, may take a week or longer to fully dismantle. The process is also affected by the accessibility of the crane, the number of people involved, and whether additional lifting equipment is needed.

Typically, disassembling a large tower crane involves several stages, and each stage must be completed carefully to ensure safety and prevent damage to the crane components.

Time Estimate for Crane Disassembly:

Crane Size Estimated Disassembly Time
Small Cranes 1-2 days
Medium Cranes 3-4 days
Large Tower Cranes 5-7 days or longer depending on complexity

Conclusion

Disassembling and transporting construction cranes is a complex and time-consuming process that requires careful planning and the right equipment. Whether it’s a large tower crane or a smaller mobile crane, disassembly, transportation, and reassembly all require expertise and coordination. The time it takes to complete these tasks can vary based on the size and type of crane, but safety is always a top priority throughout the process.


  1. Learn more about tower cranes and their importance in construction projects. 

  2. Understand the function and importance of the jib in construction cranes. 

  3. Discover how counterweights help maintain the balance of construction cranes. 

  4. Learn about the functionality and advantages of truck-mounted cranes. 

Leave a Reply

Your email address will not be published. Required fields are marked *

The CEO of Vega Heavy
Jiawei Cao

Hi, I'm the author of this blog. With a deep passion for tower cranes, I've dedicated my career to helping clients achieve excellence in their construction projects. For years, I've provided expert solutions and guidance, ensuring efficiency and safety on every site. If you have any questions or need a tailored solution, don't hesitate to reach out. I'm here to help!

RECENT POSTS

Have Any Question?

Subscribe Now

Looking to Purchase Tower Cranes for Your Project?

Read These 5 Tips to Save Costs When Purchasing Tower Cranes from China

Subscribe Now